NightHawk - Appraising Reimagined | Bradford Technologies
NightHawk by the Numbers
Number of Appraisers Trained:  
2204
Number of Software Updates:  
106
Number of Enhancements:  
131

2026 NightHawk Usage Fee: FREE

2027  NightHawk  Membership  Plans

Choose the plan that best suits your appraisal needs.
(requires a 12-month commitment)

ClickFORMS

$79 /mo
ClickFORMS Only
Unlimited Units
Limited Data
  • ✓Use Your Own Data
  • ✓MLS Import / 1004MC Service
  • ✓150 Flood Maps / yr
  • ✓Location Maps
  • ✓Census Tract
  • ✓Permit History
  • ✓Inspect-a-Lot Mobile App

NightHawk 1

$99 /mo
ClickFORMS & NightHawk
Unlimited Units
Limited Data
  • ✓Use Your Own Data
  • ✓Subject Market Analysis
  • ✓150 Flood Maps / yr
  • ✓Location Maps
  • ✓Census Tract
  • ✓Permit History
  • ✓FieldHawk Inspection AppBETA

NightHawk 2

$149 /mo
ClickFORMS & NightHawk
12 units included
$12.50 ea. add'l
Full Data Access
  • ✓12 NightHawk Units included
  • ✓200 Sales & Listings in Market
  • ✓Overall Market Analysis
  • ✓Regression Analysis
  • ✓Comp Photo retrieval
  • ✓Advanced analysis tools
  • ✓Unlimited Flood Maps
  • ✓Location Maps
  • ✓Census Tract
  • ✓Permit History
  • ✓FieldHawk Inspection AppBETA

NightHawk 3

$199 /mo
ClickFORMS & NightHawk
25 units included
$10.00 ea. add'l
Full Data Access
  • ✓25 NightHawk Units included
  • ✓200 Sales & Listings in Market
  • ✓Overall Market Analysis
  • ✓Regression Analysis
  • ✓Comp Photo retrieval
  • ✓Advanced analysis tools
  • ✓Unlimited Flood Maps
  • ✓Location Maps
  • ✓Census Tract
  • ✓Permit History
  • ✓FieldHawk Inspection AppBETA

NightHawk 4

$249 /mo
ClickFORMS & NightHawk
Unlimited Units
Full Data Access
  • ✓Unlimited NightHawk Units
  • ✓200 Sales & Listings in Market
  • ✓Overall Market Analysis
  • ✓Regression Analysis
  • ✓Comp Photo retrieval
  • ✓Advanced analysis tools
  • ✓Unlimited Flood Maps
  • ✓Location Maps
  • ✓Census Tract
  • ✓Permit History
  • ✓FieldHawk Inspection AppBETA

Comprehensive Feature Comparison

CLICKFORMS FEATURES ClickFORMS Only
$79/mo
NightHawk 1
$99/mo
NightHawk 2
$149/mo
NightHawk 3
$199/mo
NightHawk 4
$249/mo
NIGHTHAWK FEATURES
ClickFORMS Software ✓   ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ NightHawk Software
ClickFORMS Online ✓   ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ Supervisor/Group Access
Inspect-a-Lot Mobile App ✓   ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ FieldHawk Inspection App
Location Maps ✓   ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ Location Maps
Flood Maps (150 Maps/yr) ✓   ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ Flood Maps
Permit History ✓   ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ Permit History
Market Analysis (1004MC) ✓   ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ Market Analysis
MLS Import Wizard ✓   ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ MLS Import Wizard
Custom MLS Mapping ✓   ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ Custom MLS Mapping
Technical Support (7 day) ✓   ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ Technical Support (7 day)
ClickFORMS Training ✓   ✓   ✓ ✓ ✓ ✓ ✓ ✓ Subject Public Record
AMC Connection ✓   ✓   ✓ ✓ ✓ ✓ ✓ ✓ Subject MLS Record & Photos
AppraisalWorld Membership ✓   ✓   ✓ ✓ ✓ ✓ ✓ ✓ Google StreetView
Appraisal Order Manager ✓   ✓   ✓ ✓ ✓ ✓ ✓ ✓ Aerial Parcel View
            ✓   ✓   ✓ 200 Sales & Listings in Market
            ✓   ✓   ✓ Market Area Identifier
            ✓   ✓   ✓ Overall Market Analysis
        ✓   ✓   ✓   ✓ Subject Market Analysis
            ✓   ✓   ✓ Regression Analysis
            ✓   ✓   ✓ Comp Photo Retrieval
        ✓   ✓   ✓   ✓ Sales Comp Worksheet
            ✓   ✓   ✓ Prior Sales History
        ✓   ✓   ✓   ✓ Land Analysis
        ✓   ✓   ✓   ✓ Rent Schedule
        ✓   ✓   ✓   ✓ Cost Approach
        ✓   ✓   ✓   ✓ Income Approach
        ✓   ✓   ✓   ✓ Compliance Checking
        ✓   ✓   ✓   ✓ Auto Report Generation
        ✓   ✓   ✓   ✓ Zip File Generator
 

NightHawk Release Notes

NightHawk Updates and Fixes
October 30th, 2026
Enhancements:
  • Improved saving to help prevent file corruption.
  • Removed Export Backup from the main order list to prevent incorrect addresses from displaying.
  • Eliminated the save dialog when refreshing subject data in the Sales Grid.
  • Refined the display of imported property views and ranges.
  • Updated the handling of imported property amenities.
  • Corrected heating system type and fuel imports.
  • Expanded Property Description fields to show more garage and driveway details.
  • Unlocked the Sketch Commentary field for editing.
  • Added character limits to the Subject Overview unit and state code fields.
  • Enabled Intended Use integration and validation for Purchase and Refinance transactions.
  • Marked required fields in My Profile.
Bug Fixes:
  • Resolved a saving issue in Assignment Exhibits.
  • Site features now save after running Compliance.
  • Prevented Subject Market Summary recalculations from overwriting user entries.
  • Blank JSON values no longer overwrite existing subject data.
  • Restored missing sale prices in Transfer History.
  • ADUs now display properly in the Outbuilding section.
  • Added a missing em dash for single outbuildings in the Sales Grid.
  • Corner units now display properly in Sales Grid PDFs.
  • Improved formatting for Amenities Miscellaneous — Other.
  • The Common Amenities row now displays when None is selected in Project Information.

Previous NightHawk Release Notes

 October 23rd, 2026

Enhancements:

  • Set Water Frontage as the default category for Site Water Frontage images.
  • Enhanced the Compliance popout.
  • Moved the Dwelling Exhibit icon next to the Exhibits header.
  • Added a Skip option when fetching comparable transfer history.
  • Corrected comparable sale types during data retrieval.
  • Made Half Bath required in Data Reviewer.
  • Required the MLS Identifier when the Data Source is MLS.
  • Cleared inapplicable sales fields when switching to Listing.
  • Auto-populated Data Reviewer validation results after Rank Module transfers.

Bug Fixes:

  • Preserved checkbox selections when reordering comparables and saving or loading data.
  • Resolved Reconciliation Summary button flashing after file opening.
  • Corrected Site Utility Other XML output.
  • Corrected comma placement in the Reconciliation Opinion of Market Value.
  • Ensured zero values print in Cost Approach calculations.
  • Corrected sale types when transferring listings.
  • Prevented Indicative Value from recalculating or overwriting user input.
  • Corrected Location of ADU printing.
  • Enabled colons in data sources.
  • Corrected the USDA enumeration.

 October 16th, 2026

Enhancements:

  • Allowed users to change the property address up to three times.
  • Added a button at the top of the screen to return to the previous module.
  • Improved the user interface in the Market Summary module.
  • Improved the user interface in the Reconciliation module.
  • Stopped automatically calculating the Opinion of Market Value.

Bug Fixes:

  • Fixed an issue that caused an empty image to be broadcast when the property boundary image was unavailable.
  • Fixed an issue with the Site Utilities Shared Indicator.
  • Fixed an issue with the Other Primary Access description.
  • Fixed an issue with the Site Access Material Type description.
  • Fixed user interface issues in dialogs containing Other description fields.
  • Allowed users to clear Unit Interior Quality and Condition fields.
  • Corrected the defect list for Unit Interior.
  • Fixed an issue that prevented users from entering an Other description for ADU Outbuilding.
  • Removed commas from ZIP file names.
  • Removed commas from certain price fields.
  • Fixed an issue that caused blank defects to be imported.

 October 9th, 2026

Enhancements:

  • Status is now the first module on every new order.
  • A new confirmation prompt verifies the address when starting an order, allowing immediate corrections.
  • Moving the geocode marker at the start of an order now updates all report maps.
  • Site Size automatically transfers to Parcel Site Size, eliminating duplicate entry.
  • Scope of Work comments are easier to manage. Enter a comment to include it in the XML, or leave the field blank to indicate "No." No separate checkbox is needed.
  • The Site Owned in Common options now clarify the meaning of selecting "No."
  • Transfer History has been redesigned for improved readability.
  • Amenities fields now guide users toward valid counts and areas.
  • The Data Reviewer opens in a side panel and stays open while reviewing errors.
  • ADU and outbuilding handling has been improved.
  • Unit ID and Structure ID now populate automatically when adding comparables.
  • Listing fields now update dynamically, disabling sale-related fields when a listing is selected.

Bug Fixes:

  • MLS imports no longer stall when the Year Built field is missing.
  • The Dwelling Cooling detail field can now be removed when not applicable.
  • The Site Has Characteristics That Impact Value section remains visible until Yes or No is selected.
  • The Street View caption now clarifies which photo belongs in that field.
  • The Market Summary map now displays the correct pushpins.
  • The Rental Grid now displays correctly when Month to Month is set to No, including adjusted rents and previously missing comparable fields.
  • Typos in the final value condition statement have been corrected in Reconciliation.
  • Dwelling and outbuilding defects no longer appear twice.
  • Comparable properties now display ADUs and outbuildings even when the subject has none.
  • An issue affecting the Site Influence field has been fixed.

 October 2nd, 2026

Enhancements:

  • Added support for Assignment Exhibits and related backend functionality.
  • Updated the Completion Report to display the new Observed Issues table.
  • Updated the Sales Grid to correctly print when the Subject has multiple outbuildings.
    Note: Users must still mark a row as relevant, such as Gross Building Area, for the section to print completely.

Bug Fixes:

  • Corrected Subject Rent Control field in the Income Approach Module.
  • Fixed file export when the browser does not support the File Save dialog.
  • Fixed an issue that prevented signatures from uploading under certain circumstances.
  • Corrected the available options for Land Comparable Data Source.
  • Fixed issues in the Completion Module, including Defect Other Description and deleting new repair table entries.

 September 25th, 2026

Enhancements:

  • Added Copy All from Subject shortcut to the Sales Grid.
  • Added copy/paste functionality for comparable data in the Sales Grid.
  • Added a My Preferences option to use the file name as the photo caption.
  • Updated ADU Outbuilding area input and color coding to match Unit Interior.
  • Added a Yes/No checkbox to Scope of Work Comments per GSE requirements.
  • Improved saving performance by reducing workfile sizes.
  • Added an alert for ZIP file creation errors.

Bug Fixes:

  • Corrected Other Room Type labels in Unit Interior.
  • Corrected Vehicle Storage Materials in the Sales Grid.
  • Resolved PDF display issues for ADU Outbuilding and multiple heating sources.
  • Resolved Completion Report display issues.
  • Corrected the Outbuilding is real property field for comps.
  • Corrected the All rights included field for comps.
  • Corrected the Rights not included field for comps.

 September 18th, 2026

Enhancements:

  • Updated Unit Interior handling so all 8 unit area fields write "0" when users explicitly enter 0, including finished, unfinished, and nonstandard areas.
  • Added additional links from compliance errors to related modules, with more links planned.
  • Added a Data Source Other Description field to ADU Outbuilding.
  • Added additional information to improve image and PDF optimization.
  • Added a Sub Section column to the Compliance module check.
  • Added character limits to applicable fields.

Bug Fixes:

  • Fixed incorrect dynamic field hiding in Sales Contract Analysis.
  • Fixed issues preventing users from removing Market Impact settings and corrected Other Description handling in the Projects module.
  • Fixed an issue with printing Water Frontage – Other Description.
  • Fixed an issue preventing the Sales Contract PDF from displaying in the module after loading.
  • Fixed an issue with the Cost Approach when Other is selected as the data source.

 September 11th, 2026

Enhancements:

  • Added links from compliance errors to related modules, with about 300 links currently available and more being added.
  • Saved comments now work with all fields that have pop-out text boxes.
  • Additional Info module now supports inserting PDFs.
  • Updated Import/Export. Note: files can only be imported back into the report they were originally exported from.
  • Added additional dynamic fields to the Sales Contract module.
  • The default proximity unit for Income/Rental is now miles.
  • Made several small user interface improvements, including adding dynamic fields, removing the default Private Client checkbox, and cleaning up the Status module.

Bug Fixes:

  • Corrected rounding of the total depreciated value in the Cost Approach.
  • Fixed the Water Frontage Other description field.
  • Fixed map issues in the Income Approach.
  • Fixed Project Info Sales Grid information not writing correctly to XML.
  • Corrected the Certification enum type.
  • Exterior window information from the Sales Grid Subject now writes to XML.
  • Fixed issues with sending address unit information to ATOM and Quantarium.
  • Fixed the ability to remove the default Private Client checkbox.

 September 4th, 2026

Enhancements:

  • Double-click rooms to quickly add them to the Unit Interior menu.
  • Sales Grid now supports printing two garages in PDF.
  • Renamed Aerial to Subject Boundary View and removed the four Pictometry views.
  • Updated XML condition to display for Subject and Comparable properties based on if the land is owned in common.

Bug Fixes:

  • Fixed MLS file uploads when the subject is not geocoded.
  • Resolved issues with Subject Listing History – Other Types.
  • Fixed street access display in the Sales Grid.
  • Fixed removal of unintended values entered in the Unit field.
  • Listing History now handles Pending status correctly for PDFs.

 August 28, 2026

Enhancements:

  • Expanded Dynamic Fields and added a preference to disable the feature.
  • Removed PDF/XML files from workfiles to reduce save times.
  • Improved ADU Outbuilding level settings and selection behavior.
  • Added support for 0-value finished/unfinished areas in ADU Outbuilding.
  • Removed Revision Report Request Type.
  • Disabled user interactions within the Inspection module in production.
  • Updated the Display Engine for improved performance and functionality.

Bug Fixes:

  • Corrected PDF display of Subject Transfer History when it has Deed Transfer Only and no other sales history.
  • Resolved issues with ADU Outbuilding Exhibits.
  • Fixed an issue causing the Manufactured module to send null images.
  • Corrected Intended Use – Other Description so it displays properly in PDFs.
  • Fixed Project Monthly Fee to correctly write a value of 0 to XML.
  • Resolved Manufactured Home display issues.
  • Fixed Land sales PDF issues.

 August 21, 2026

Enhancements:

  • Opened up subject history listing for editing after adding entry to the table.
  • Site size unit will transfer to the Sales Grid and automatically distinguish between Sq Ft or Acres.
  • Alert users if a state field is populated with more than two characters.
  • Allowed the signature date to be changed freely.
  • Added Newsdesk to Nighthawk.
  • Beginning to roll out dynamic fields throughout modules over the upcoming weeks.

Bug Fixes:

  • Updated state fields to use the standard two-character state abbreviation.
  • Eliminated XML schema error for Exterior Drive-By. Drive-By now works as long as you put in no rooms.
  • Applied fix for Structure Volume xml issue.

 August 14, 2026

Enhancements:

  • NightHawk can now bulk geocode user imported MLS data.
  • Sales grid auto checks all relevant checkboxes when comparable data is entered.
  • Data reviewer checks that all relevant checkboxes are correctly checked.
  • Made it easier to import PDFs into the sketch module, particularly one-page PDFs.
  • Amenities reordered for easier selection.
  • Visually clarified where to enter APN.
  • Simplified proximity distance units in address pop-ups.

Bug Fixes:

  • Fixed issue with selecting Exterior Drive-by as appraisal type.
  • Addressed Comps 7-8-9 not appearing in the PDF correctly.
  • Removed Import Subject and Import Comps buttons from Sales Worksheet.
  • Corrected MLS Data Source import to the sales grid.
  • Removed unused field in Unit Interior.

 August 7, 2026

Enhancements:

  • Added the ability to create a map for rental comparables.
  • Color-coded required fields for clarity.
  • Added the ability to geocode comparables directly from the sales grid.
  • Adjusted how Quality and Condition auto-adjustments calculate relative to the subject property.
  • Improved how comparable weight calculations are handled.
  • Simplified drop downs for interior condition fields in the sales grid.

Bug Fixes:

  • Fixed issue with the As-is condition field didn't write to the xml correctly.
  • Ensured total adjustments calculate correctly when entering certain comparable adjustment types.
  • Fixed issue with the sales grid not saving the other description under certain circumstances.
  • Fixed issue with the Completion Report not displaying the correct signature.
  • Corrected issue where unfinished area wasn't correctly handling a square footage of zero.
  • Fixed issue with the sales grid not saving the other description under certain circumstances.
NightHawk Hero

It's Time to
Rethink the Role of
Appraisal Software

" Should I continue using my software as a form-filler or should my software help me produce the entire appraisal, start to finish? "

It's Time to Discover

NightHawk Logo

NightHawk Demonstration Webinar

NightHawk is the most innovative solution to the new UAD 3.6 mandate. Bradford Technologies has created a new approach that eliminates the drudgery of old form-filler software. See the opportunities that are before appraisers as we all move to a new way of report building. See how NightHawk will help you produce the entire appraisal from start to finish.

  • Automated Report Generation 
  • All Data Sources Auto-Retrieved
  • Built-in Market Analysis

NightHawk Frequently Asked Questions

What are the system requirements for Nighthawk?

How do I access Nighthawk?

Can I use my own MLS or am I restricted to what Nighthawk pulls in?

Is there Spark, Datamaster, or other MLS integration?

I work in a rural area where it's not always possible to get reliable public records data, can I still complete a report in Nighthawk? Is it possible to fill in all fields manually?

Are there saved comments, responses, and templates?

Can I import my old XML files? Or import old saved comments and responses?

Is there a mobile app for Nighthawk?

Will there be sketcher integration?

Can Nighthawk do UAD 2.6 reports or Non-Lender reports?

Fannie Mae & Freddie Mac UAD Resources

Questions and Answers — UAD and Forms Redesign

Sean Murphy, Freddie Mac Single-Family, Credit Policy Risk Analytics Manager and Ken DeFeo, Fannie Mae Single-Family, Credit Risk Senior Manager answer common questions.

Inspection and Reporting Tips for Appraisers

Fannie Mae has created a new guide "Inspection and Reporting Tips for Appraisers".

Uniform Mortgage Data Program® (UMDP®)

The UAD 3.6 and Forms Redesign team have developed new and updated existing documentation to support ongoing implementation efforts.

Fannie Mae UAD Documentation

UAD 3.6 announcements, documentation and resources

Fannie Mae FAQs

Uniform Appraisal Dataset (UAD) 3.6 Frequently Asked Questions

Freddie Mac FAQs

Frequently Asked Questions about the Uniform Appraisal Dataset (UAD) 3.6.

Contact Us

Call Us

800-622-8727

Monday - Friday: 6AM - 6PM PT
Saturday – Sunday: 8AM – 3PM PT

NightHawk System Requirements


  • 1920 x 1080 screen resolution
  • NightHawk works best on 24" or larger monitors
  • Latest Browser — Chrome is recommended
  • At this time we do not support Safari or Firefox
  • High speed internet connection

Running NightHawk on anything less than our minimum requirements may result in unexpected and unsupported issues.

NightHawk - Appraising Reimagined | Bradford Technologies